An emergency response plan for a commercial building is a short, written set of answers to the questions that go unanswered at 2 a.m.: who is called first, who can shut off the water, who can spend money, and who tells the tenants. In California, employers with more than ten employees must already have a written emergency action plan for their people. A building plan extends that to the property, the systems and the vendors.
Plans rarely fail on strategy. They fail on details: a phone number for someone who left, a valve nobody can find, a decision that waits for one person. This guide covers what the rules require, the scenarios worth writing down for Silicon Valley buildings and how to test the plan.
At a minimum, the elements the law lists for protecting employees, plus the building-specific detail that makes them usable. California's Title 8 section 3220 requires an emergency action plan in writing, covering:
The section also requires employers to train enough people to assist an orderly evacuation, to review the plan with each employee when they are first assigned or when their duties or the plan change, and to keep a copy accessible. Employers with ten or fewer employees may communicate the plan orally. Federal OSHA's 1910.38 lists similar elements and adds a requirement to maintain an employee alarm system.
Those rules protect people. A property manager also needs the pieces that protect the building: a contact tree, a decision matrix, a map of shutoffs, pre-arranged vendors and staged supplies.
Because they go out of date silently and nobody notices until the call is made. A monitoring company that dials a former employee at night is the classic failure, and it is entirely preventable.
Build the list in tiers and give each tier an owner and a check date:
Verify the list on a schedule, such as quarterly, and whenever someone changes jobs. Post it, save it on phones and keep a copy outside the building.
Then write down authority. Decide in advance who may shut off utilities, who may call out vendors and up to what spending limit, who may order an evacuation and who must be called before the building closes. The limits are a business decision for your owner, but nobody should have to ask permission while water is coming through a ceiling. For more on pre-arranging vendors, see our guide to emergency vendor networks.
It should say where the valves are, who may close them and what happens in the first hours. Water is the most common emergency a building crew will actually face, and the damage grows while the response waits.
Put the following in the plan:
Drying speed matters for a specific reason. The US EPA's guidance on water damage cleanup and mold prevention gives guidelines for responding to clean water damage within 24 to 48 hours to prevent mold growth. It is a guideline, not a cliff: EPA notes mold growth will not always occur after 48 hours, and may have occurred even if materials were dried within it. Ceiling tiles and fiberglass insulation that get wet are to be discarded and replaced, and EPA says carpet should be extracted and dried within the same window.
Its water damage table applies only to clean water. If the source may be sewage or contaminated, EPA says not to use fans before determining that the water is clean, and to bring in an experienced professional. For the full playbook, see our post on water damage prevention and response.
Write one short protocol for each: how you will know, who is told and what you will do.
Power outage. Decide who confirms whether the outage is building-only or area-wide, who contacts the utility, how tenants are notified if the lights and elevators are down, and which critical systems, such as fire alarm, security and servers, depend on batteries or a generator. If you own a generator, name who tests it.
HVAC failure in hot weather. Cal/OSHA's indoor heat rule applies to indoor work areas where the temperature equals or exceeds 82 degrees Fahrenheit, with added duties at 87 degrees when employees are present, including engineering controls to reduce the temperature and heat index. Brief incidental exposures are exempt. The practical step is to know which areas of your building heat up first, monitor them during a cooling outage and have an HVAC contractor's emergency line ready.
Wildfire smoke. Cal/OSHA's wildfire smoke standard applies when the current AQI for PM2.5 is 151 or greater, though it exempts enclosed buildings whose air is filtered by a mechanical ventilation system as long as windows, doors and other openings are kept closed. That makes the HVAC system the plan. The EPA's recommendations for reducing wildfire smoke call for a written, building-specific smoke readiness plan that includes evaluating whether the HVAC system can handle a MERV 13 or higher filter, a full maintenance check, weatherizing to limit smoke intrusion, portable air cleaners and monitoring indoor PM2.5. See our post on wildfire smoke and building operations for the operating side.
It should cover the first minutes, the first hour and the decision about whether the building can be used. The reason to write it down is the odds. The US Geological Survey says that within the next 30 years the probability of a magnitude 6.7 earthquake in the San Francisco Bay area is about 72 percent, about 51 percent for a magnitude 7 and about 20 percent for a magnitude 7.5, based on the third Uniform California Earthquake Rupture Forecast (USGS FAQ). USGS updates its forecasts, so check that page for the current figure.
For the shaking itself, the Earthquake Country Alliance says that Drop, Cover, and Hold On is the appropriate action to reduce injury and death, and recommends practicing it regularly, for example during the Great ShakeOut drill each October.
After the shaking stops, the plan should give staff a short order of operations:
Run it as an exercise, write down what broke, and fix it. The Ready.gov guidance for businesses says to conduct testing and exercises to evaluate the effectiveness of a preparedness program, and notes that tabletop exercises are discussion-based sessions where team members meet and talk through their roles for a particular emergency. Functional exercises go further: personnel validate plans by performing their duties. Ready.gov also says an after-action report documenting suggestions for improvement should be compiled after the exercise and addressed through a corrective action program (Ready.gov exercises).
A simple annual rhythm works for most buildings:
Expect the drill to find something small, such as a seized valve, a missing wrench or a number that rings to nobody. That is its purpose.
Is an emergency action plan required in California? Yes. Title 8 section 3220 requires an emergency action plan covering evacuation procedures, employee accounting, reporting and the other listed elements. It must be in writing unless the employer has ten or fewer employees.
How often should an emergency response plan be reviewed? Review it whenever the plan, the building or someone's duties change, because the rule requires employees to be re-briefed at those moments. Check the contact list on a regular schedule and run a drill at least once a year.
Who should be on the emergency contact list for a commercial building? The facility and property managers with backups, the after-hours lines of your plumbing, electrical, HVAC, fire and restoration vendors, the utilities and alarm monitor, and the non-emergency fire and police lines. Every entry needs a named owner who confirms it.
Does a building need a separate plan for earthquakes and wildfire smoke? Each needs its own page, because the first actions differ. USGS puts the 30-year probability of a magnitude 6.7 quake in the Bay Area at about 72 percent, and Cal/OSHA sets a wildfire smoke trigger at an AQI of 151 for PM2.5.
A plan only works if someone keeps it current. MAFM's facility management service can maintain your contact tree, vendor list and shutoff maps, schedule the drills and run the after-action follow-up with your team. Talk to MAFM about facility management.
MAFM offers comprehensive facility management solutions tailored to your business needs.