AI Facility Management: What It Can Do for Response Times
January 21, 2026

BAS fall changeover is the controls-side work that decides whether a building heats and cools sensibly once summer ends: updating economizer limits, heating and cooling lockouts, schedules, deadbands and sensor checks, then watching trend data to confirm the changes took. Serviced equipment will still fight itself if the building automation system (BAS) is running summer logic.
In Silicon Valley the work matters because mild days and cool mornings sit side by side for weeks. That is the condition that exposes stale setpoints, a drifted outdoor air sensor or an override someone forgot to release. The checklist below is built on federal guidance, and the last section covers who should do the work.
Because the equipment only does what the controls tell it to. A mechanical inspection can come back clean while the sequence, the schedule or a sensor reading is wrong, and the result shows up as comfort complaints rather than a failed part.
The U.S. Department of Energy's lab at Pacific Northwest National Laboratory (PNNL) makes the same point about economizers. PNNL's air-side economizer guide says that if an economizer is controlled incorrectly it "can supply too much outdoor air when outdoor conditions are not favorable," which increases energy use in both hot and cold conditions. It also warns that these problems "may be left unnoticed or undiagnosed for an extended period of time."
PNNL's Building Re-Tuning program describes the broader pattern: many large buildings have sophisticated controls but are not properly commissioned, operated or maintained, and it states that 10 to 30 percent of the energy used in commercial buildings is wasted because of improper and inefficient operations. Treat that as a federal lab's national estimate, not a prediction for your building.
Start with what the controller is actually doing, not what the sequence says on paper. The PNNL economizer guide lists a sample checklist, and several lines are about controls rather than hardware:
The minimum position deserves a look too. PNNL notes that if the outdoor air minimum is excessive, "excessive heating and cooling energy" is used to condition outdoor air whenever the economizer is not active.
If your economizers use humidity sensors to calculate enthalpy, PNNL says those sensors require regular calibration, and that if maintenance resources are not available, reverting to a dry-bulb limit strategy may improve operation. For the physical side of this work, see our post on economizer maintenance before the cooling season ends.
Lockouts should reflect the building's real balance point, which is usually lower than the old setting. PNNL's Re-tuning Measure Guide (April 2023) says 60 °F is usually a threshold above which well-functioning buildings can avoid using heating, and that well-insulated or high interior load buildings may be able to push it to 50 °F or lower.
The same guide gives a method for the cooling side: find the coldest supply air temperature the air handlers need when outdoor air is 55 to 60 °F, subtract 5 degrees, and use that as the outdoor air lockout for chillers. Its validation advice is the useful part. Lockouts can reveal faulty economizers and leaking coil valves, and the guide says to repair a leaking valve "rather than removing lockout programming."
These are starting points from a federal guide, not settings to copy. Your controls vendor or engineer should confirm any number against your equipment and sequence.
Often not. PNNL's O&M Best Practices Guide, Release 3.0 (2010) says facility managers should aim to match HVAC scheduling to the actual tenant schedules and adjust it as those schedules change through the year. A weekday pattern set years ago may not fit a tenant that now has staggered or hybrid attendance.
Before changing anything, gather what you can: badge reads, tenant requests and what the help desk hears about early and late use. Then compare it with the schedules in the BAS. The same guide's annual checklist includes verifying in the control software that schedules and setpoints are accurate for season and occupancy.
Two cautions keep schedule changes from backfiring:
Widen the gap between heating and cooling setpoints where comfort allows, and make sure any simultaneous heating and cooling is by design. The 2010 guide advises managers to strive for the largest throttling range (deadband gap) they can, so the system does not slightly overcool, flip to heating, then slightly overheat and flip back. It describes that constant cycling as inefficient, hard on equipment and the cause of the building constantly "hunting" for the right temperature.
Its annual checklist says to confirm that "the only simultaneous heating and cooling is by design." On a day with a cool morning and a warm afternoon, that is a good question to put to every zone that draws complaints. For variable air volume systems, the re-tuning guide describes discharge air temperature reset: raise the temperature in cold weather without driving many boxes into cooling, and lower it in warm weather without driving many into heating.
Check sensors before trusting any trend, because every control decision depends on them. The 2010 guide says sensor calibration is "an often overlooked activity" and that sensors out of calibration "can lead to enormous energy penalties" that can go undetected for years. Its list of sensors that most need calibration starts with outside air, mixed air, return air and discharge air temperature.
For CO2-based demand-controlled ventilation, the Department of Energy's Ventilation Assessment and Action Guide (September 2025) says BAS-integrated CO2 sensors should be calibrated on a regular basis because sensor drift commonly occurs over time. It suggests programming the BAS to flag extended periods when the outdoor air damper sits at 0 or 100 percent, which is a good sign of drift or another ventilation problem.
PNNL's re-tuning guide adds that CO2 sensors "can be notoriously faulty," says ambient CO2 is around 400 ppm (so a reading below that points to a bad sensor), and recommends against any strategy that could drive outdoor air dampers to 100 percent indefinitely. It also says demand-controlled ventilation does not save much energy in mild or marine climates, so confirm it is worth maintaining in your building before investing in it.
Watch the trends. PNNL's economizer guide lists the points to trend: outdoor air temperature (and humidity), return air temperature, mixed or supply air temperature, outdoor and return damper positions, and zone CO2 if available. Compare a few days before and after each change, and look for what the controller did, not only what you entered.
Also release old overrides. A stale manual override left from a prior test can keep old logic running under new programming, so list every override in the BAS and decide whether each should still be there.
Document it all. The guide's checklist ends with recording maintenance activities in a logbook or electronic CMMS. Write down each setpoint, schedule and lockout you changed, the old and new value, who changed it and the date, so the next changeover starts from a record.
Controls programming belongs to your controls contractor, mechanical contractor or building engineer, and PNNL says economizer work should be done by trained and authorized personnel. MAFM does not program building automation systems. As a facilities management company, MAFM plans the changeover, schedules the vendor visits, keeps the checklist and change log, and follows up on comfort complaints so they get traced to a cause. The same coordination is what we describe in our posts on building automation and load shedding. If your buildings are in the South Bay, our San Jose team can start with a walkthrough.
How often should BAS setpoints and schedules be reviewed?
PNNL's 2010 O&M guide puts verifying control schedules and setpoints for season and occupancy on its annual checklist, and its economizer guide puts a review of economizer programming and trend data on a quarterly checklist. A seasonal review plus a look whenever tenant schedules change is a reasonable routine.
Is there a single correct economizer lockout temperature for the Bay Area?
No. The right limit depends on the control strategy (dry-bulb or enthalpy), the equipment and the sequence of operation. PNNL's example check is that dampers modulate open when the outdoor temperature is between 45 and 65 °F with a call for cooling, so verify against your own sequence and trends.
Can we fix controls problems without a controls contractor?
Some checks, like reading trend data and verifying schedules, can be done by a trained in-house engineer. Programming changes, sequence edits and calibration should go to people authorized on your system, and every change should be logged.
Is demand-controlled ventilation worth keeping in a mild climate?
PNNL's re-tuning guide says it does not save much energy in mild or marine climates. If you already have it, keep the sensors calibrated and the fault flags on, because a drifted sensor can waste energy or under-ventilate rooms.
If changeover controls work keeps slipping between your engineer, your vendors and your help desk, talk to MAFM about facility management. We will build the checklist, schedule the vendors and keep the change record.