A Q2 facility performance review turns six months of work orders, inspections, vendor scorecards and tenant complaints into a short list of priorities for the second half of the year. Do it by pulling the same five data sets every time, comparing them month by month instead of as one average, and ending with no more than seven named priorities, each with an owner and a measure.
This guide gives a review you can run in an afternoon. It follows the Q1 review in our quarterly review guide and leaves the money side to the mid-year budget review.
Cover five things: operational quality, vendor performance, tenant feedback, safety and compliance, and strategic projects. Anything outside those five belongs in the budget review or can wait.
Set up the review by collecting one export or log for each:
If any of these does not exist, that is your first finding. A review cannot be better than the records behind it.
Read it as a trend by month, not as a six-month average. Two buildings can average the same inspection score while one is improving and the other is flat or sliding, and the right response differs.
For each month, record the inspection result, the number of work orders and the share that were planned maintenance. Then ask three questions:
On cost, the U.S. Department of Energy's 2010 operations and maintenance guide estimates that preventive maintenance can save 12% to 18% over a reactive program (DOE FEMP O&M Best Practices Guide, Release 3.0). That is an older federal estimate, not a promise for your building, but it supports a simple test: if reactive work is not shrinking, ask why preventive tasks are not getting done.
Compare each vendor's Q1 and Q2 scores, then compare vendors to each other. Six months is enough data to separate a one-off bad month from a pattern.
For every vendor, check four things:
If you do not have a scorecard yet, build one this quarter and start scoring next quarter.
It tells you which problems affect the most people. Sort complaints and requests into categories such as restrooms, temperature, cleanliness, noise, security and response time, and count them by month.
The three largest categories are your best improvement targets, because they affect the most tenants. Compare them with the seasonal calendar: if temperature complaints rose when cooling season started, that points to spring preparation for next year, and to a check now that the problem has stabilized.
Also note what tenants did not complain about. A category that stayed quiet through a vendor change or a busy move month suggests the process worked.
Recheck every item with a date on it. A Q2 review is a good moment, because anything that slipped in the first half is still fixable in the second.
Compare each project to its original plan: scope, schedule, cost and owner. Capital projects, software rollouts, sustainability work and process changes usually slip quietly, so ask for evidence, not a status.
For software, look at actual use: how many staff logged in last month, how many work orders were created in the system rather than by email. Installed is not the same as adopted.
For capital projects, compare the latest estimate with the original and tell ownership about changes before committing second-half work. The budget side of this belongs in the mid-year budget review.
Write no more than seven priorities. Each one gets a finding from the review that drives it, an action, an owner and a measure to check at year end.
A short list gets done. A long one drifts. If everything is a priority, rank them by tenants affected and risk, and park the rest on a list for next quarter.
Share the list with ownership or your management team in a one-page summary. Then book the next review date on the calendar before you leave the meeting, so the list gets checked.
When should the Q2 review happen?
Do it as soon as the quarter's data is closed, usually in the first few weeks of July. That leaves the rest of the year to act on the findings, and it comes before most budget cycles begin.
How is a performance review different from a budget review?
The performance review looks at how well the building runs: quality, vendors, tenants, safety and projects. The budget review looks at money. They use some of the same data, but run them separately so cost issues do not crowd out service issues.
What if I do not have six months of clean data?
Use what you have and say where it is thin. Missing or inconsistent records are a finding. Fix the logging first, and treat the next quarter as the first clean baseline.
How many priorities should come out of the review?
No more than seven. Each needs an owner and a measure, so someone can tell at year end whether it worked.
If you want a facility management team to run the review with you, from inspections and vendor scorecards to the second-half plan, see MAFM's facility management service or our vendor scorecard guide for the next step.
MAFM offers comprehensive facility management solutions tailored to your business needs.