Reduce Facility Operating Costs in Silicon Valley, 2026
January 12, 2026

A good facility management RFP does four things: it describes your building so bidders can price the real job, it defines the work and the standard in terms you can inspect, it tells vendors exactly how proposals will be scored, and it asks for proof that the bidder is legally able to do the work. A vague RFP does the opposite. It invites boilerplate answers and rewards whoever submits the lowest number.
Lowball bids are a symptom of a loose document. When bidders are not told how many restrooms, what hours, what standard or what the evaluation will weigh, they guess, and the vendor who guesses lowest wins on paper. The cuts then show up as fewer labor hours, thinner supervision or missed tasks after you have signed.
This guide walks through the sections of an RFP for janitorial and facility services, with the California requirements worth building in. It is written for property and facility managers in the Bay Area, and the structure applies to any market.
Seven sections cover it. Each one answers a question a bidder cannot price without.
Write the scope and standards before you write anything else. The rest of the document depends on them.
Detailed enough that two vendors would staff the building the same way. Include the cleanable area by type, the number of floors, restrooms, elevators and entrances, the floor finishes, and any exterior areas in scope.
Then describe how the building is actually used. A tech office with open plans, long operating hours and a busy kitchen needs a different crew than a quiet professional office open on weekdays. Say so, along with access rules, key control, loading dock procedures and any restrictions on chemicals, noise or hours.
Be honest about current pain points. If restroom consistency has been the complaint, write that down. Good bidders use it to design a fix, and weak bidders reveal themselves by ignoring it.
Replace adjectives with tasks, frequencies and a defined result. "Maintain restrooms in a clean and sanitary condition" cannot be priced or enforced. "Service all restrooms nightly: clean and disinfect fixtures, mop floors, restock dispensers, empty waste and replace liners, wipe partitions" can.
Organize the scope by area and give each area its own frequency table in bullet form:
A defined cleanliness standard helps. Many facility teams borrow the five APPA cleanliness levels used in higher education, which run from Level 1 "Orderly Spotlessness" to Level 5 "Unkempt Neglect" as one university facilities department publishes them. Pick a target level by area, such as a higher level for lobbies and restrooms than for storage, and name it in the RFP.
If your facility needs more than cleaning, such as vendor coordination for HVAC, fire and life safety, grounds or pest control, list that as a separate scope. A facility management partner can coordinate those vendors even when it does not perform the trade work itself, and the RFP should say which model you want.
An inspection method with consequences, not a sentence about "quality." Specify who inspects, how often, using what form, and what score counts as a pass.
Also decide what you will do with the results. Scores that nobody reviews do not change vendor behavior. Our post on a vendor performance scorecard for facility services covers how to track them over a contract term.
Make these pass-fail requirements, not scored extras. They also protect you.
Janitorial registration. California's Labor Commissioner requires janitorial employers to register every year. Under the DLSE's janitorial registration FAQ (March 2024), a customer who contracts for janitorial services with an unregistered employer faces a civil fine of $2,000 to $10,000 for a first violation and $10,000 to $25,000 for a subsequent one, when the contract is executed, extended, renewed or modified. Ask every janitorial bidder for a current registration number and confirm it with the Labor Commissioner's office before award.
Workers' compensation. The Department of Industrial Relations states that all California employers must provide workers' compensation under Labor Code section 3700, and that proof of coverage is a certificate of insurance from the carrier. Require the certificate with the proposal, and have your risk or legal team set the liability limits and additional insured terms.
Wage floor. California's state minimum wage is $16.90 an hour as of January 1, 2026, and some cities and counties set higher rates. Ask bidders to list the hourly pay for each position. A staffing plan priced below the legal wage plus required burden cannot be performed lawfully, whatever the proposal says.
Management systems. ISSA's CIMS program is a management standard for cleaning companies that, according to ISSA, covers areas such as service delivery, risk management and environmental responsibility, with third-party assessors verifying compliance on site. You can ask for CIMS certification or an equivalent documented quality system, but treat it as evidence of process, not a guarantee of results on your building.
Publish the factors and their weights in the RFP, and weigh price as one factor among several. This is standard practice in public procurement: the federal acquisition rules require that all evaluation factors and their relative importance be stated clearly in the solicitation, and that the solicitation say whether the non-price factors together are more important than, equal to or less important than price. A private owner is not bound by those rules, but the logic is sound and it is fair to bidders.
Here is an illustrative split on a 100 point scale. It is a starting point, not an industry benchmark, so adjust it to what matters in your building:
To spot an unrealistic price, compare the cost breakdown to the staffing plan. Federal cost realism analysis, described in FAR 15.404-1, reviews each cost element to determine whether it is realistic for the work to be performed and reflects a clear understanding of the requirements. You can apply the same test: ask whether the hours, wages and supervision proposed can produce the scope you wrote.
Ask for the price in parts: labor hours and rates by position, supplies, equipment, management and overhead. Then check the arithmetic. A bid far below the others usually means fewer hours, lower pay or less supervision, and each of those becomes your problem after award.
State in the RFP that you may reject a proposal you judge unrealistically low. That one sentence discourages bids that are not meant to be performed.
One that gives vendors enough time to walk the building, ask questions and write a real answer. Rushed deadlines favor bidders who reuse a template.
For more on warning signs after the contract starts, see our post on red flags that a janitorial service is underperforming.
What is the difference between an RFP and an RFQ for facility services? An RFP asks vendors to propose a solution and price, and you score both. An RFQ asks for a price against a scope you have already fixed. For ongoing janitorial and facility management, an RFP is usually the better fit because staffing and management quality matter as much as price.
Do janitorial vendors in California have to be registered? Yes. Janitorial employers must register with the Labor Commissioner each year, and the DLSE says a customer who contracts with an unregistered employer can face civil fines. Ask for the registration number in the proposal and verify it before you sign.
Should price be the deciding factor? No, but it should count. Weight price alongside approach, staffing, references and transition, publish the weights, and test low bids against the staffing plan. The cheapest compliant proposal is not always the best value.
Can the same RFP cover cleaning and building maintenance? It can, if each scope is defined separately. Many owners combine janitorial and facility coordination so one partner manages the day-to-day, but vendors need separate frequencies, standards and pricing for each part.
If you are preparing an RFP or reviewing proposals, MAFM can help you define the scope, standards and inspection plan, and can respond to your RFP with a staffing plan built on your building's real requirements. Talk to us about facility management.